IAC logo
IAC Assessment: NL0105
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0105
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2024
Principal Product Hydraulics
NAICS 332912 - Fluid Power Valve and Hose Fitting Manufacturing
SIC 3492 - Fluid Power Valves & Hose Fittings
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 109,000
Annual Production 1,040,000 Units
Production Hrs. Annual 2,288
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $54,209 809,088 kWh $0.07
Electricity Demand $28,961 3,968 kW-months/year $7.30
Natural Gas $32,605 4,557 MMBtu $7.16
Other Gas $4,660 1 MMBtu $4,660.00
TOTAL ENERGY COSTS $128,719
RECOMMENDED SAVINGS* $111,996 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ Tgal $ $ $ $ $ %
01: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$76,412
Cost:
$216,424
$42 628 - - - - $4,325 - $13,795 - $58,250 - $42
628
kWh
-
-
kW-months/year
-
-
Tgal
$4,325
-
$
$13,795
-
$
$58,250
-
%
02: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$22,584
Cost:
$145,801
$396 5,907 - - - - $1,872 - $20,316 - - - $396
5,907
kWh
-
-
kW-months/year
-
-
Tgal
$1,872
-
$
$20,316
-
$
-
-
%
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,009
Cost:
$9,991
$6,992 104,360 $2,770 380 - - $247 - - - - - $6,992
104,360
kWh
$2,770
380
kW-months/year
-
-
Tgal
$247
-
$
-
-
$
-
-
%
04: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$2,197
Cost:
$40
- - $2,197 301 - - - - - - - - -
-
kWh
$2,197
301
kW-months/year
-
-
Tgal
-
-
$
-
-
$
-
-
%
05: 3.4155 METER WASTE WATER Savings:
$794
Cost:
$950
- - - - $794 74 - - - - - - -
-
kWh
-
-
kW-months/year
$794
74
Tgal
-
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$111,996
Cost:
$373,206
$7,430 110,895 $4,967 681 $794 74 $6,444 - $34,111 - $58,250 - $7,430
110,895
kWh
$4,967
681
kW-months/year
$794
74
Tgal
$6,444
-
$
$34,111
-
$
$58,250
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $ $ %
Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost Increase in Production