IAC Assessment: NL0110
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2025
Principal Product Corrugated Boxes
NAICS 322211 - Corrugated and Solid Fiber Box Manufacturing
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $50,000,000-$100,000,000
# of Employees 120
Plant Area (Sq.Ft.) 330,000
Annual Production 667,000 Thousand Feet
Production Hrs. Annual 6,600
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $336,509 5,563,008 kWh $0.06
Electricity Demand $105,425 15,049 kW-months/year $7.01
Electricity Fees $26,554 - $ -
Natural Gas $298,208 43,088 MMBtu $6.92
TOTAL ENERGY COSTS $801,945
RECOMMENDED SAVINGS* $280,256 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$262,812
Cost:
$4,671,994
$220,752 3,679,200 $42,060 6,000 - - - - - - $220,752
3,679,200
kWh
$42,060
6,000
kW-months/year
-
-
Tgal
-
-
$
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$7,360
Cost:
$160
- - $7,840 1,118 - - $(-480) - - - -
-
kWh
$7,840
1,118
kW-months/year
-
-
Tgal
$(-480)
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,063
Cost:
$4,500
$5,803 96,718 - - - - $(-640) - $(-100) - $5,803
96,718
kWh
-
-
kW-months/year
-
-
Tgal
$(-640)
-
$
$(-100)
-
$
04: 3.4155 METER WASTE WATER Savings:
$4,494
Cost:
$2,400
- - - - $4,494 858 - - - - -
-
kWh
-
-
kW-months/year
$4,494
858
Tgal
-
-
$
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$527
Cost:
$700
$435 7,251 $92 13 - - - - - - $435
7,251
kWh
$92
13
kW-months/year
-
-
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$280,256
Cost:
$4,679,754
$226,990 3,783,169 $49,992 7,132 $4,494 858 $(-1,120) - $(-100) - $226,990
3,783,169
kWh
$49,992
7,132
kW-months/year
$4,494
858
Tgal
$(-1,120)
-
$
$(-100)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $
Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost