IAC Assessment: NT0003
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NT0003
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of North Texas
Assessment Year 2023
Principal Product Bread
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $5,000,000-$10,000,000
# of Employees 63
Plant Area (Sq.Ft.) 85,000
Annual Production 20,000,000 Pieces
Production Hrs. Annual 4,780
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $162,605 2,277,457 kWh $0.07
Electricity Demand $63,894 6,387 kW-months/year $10.00
Electricity Fees $753 - $ -
Natural Gas $87,057 7,931 MMBtu $10.98
TOTAL ENERGY COSTS $314,309
RECOMMENDED SAVINGS* $54,699 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,267
Cost:
$5,705
$2,417 33,857 $850 85 $2,417
33,857
kWh
$850
85
kW-months/year
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$12,262
Cost:
$21,725
- - $12,262 1,227 -
-
kWh
$12,262
1,227
kW-months/year
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,623
Cost:
$24,707
$8,675 121,507 $1,947 195 $8,675
121,507
kWh
$1,947
195
kW-months/year
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,289
Cost:
$1,600
$3,289 46,055 - - $3,289
46,055
kWh
-
-
kW-months/year
05: 2.2533 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS Savings:
$2,238
Cost:
$3,193
$2,238 31,347 - - $2,238
31,347
kWh
-
-
kW-months/year
06: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$23,020
Cost:
$185,220
$23,020 322,456 - - $23,020
322,456
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$54,699
Cost:
$242,150
$39,639 555,222 $15,059 1,507 $39,639
555,222
kWh
$15,059
1,507
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand