IAC Assessment: NT0017
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NT0017
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of North Texas
Assessment Year 2023
Principal Product Coating, Engraving and Allied services
NAICS 332812 - Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479 - Metal Coating And Allied Services
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 61,513
Annual Production 100,000,000 Units
Production Hrs. Annual 6,912
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $87,523 1,400,279 kWh $0.06
Electricity Demand $33,322 2,809 kW-months/year $11.86
Electricity Fees $1,850 - $ -
Natural Gas $811,209 187,317 MMBtu $4.33
TOTAL ENERGY COSTS $933,904
RECOMMENDED SAVINGS* $79,912 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,272
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$50,287
Cost:
$1,258
- - - - $50,287 11,614 -
-
kWh
-
-
kW-months/year
$50,287
11,614
MMBtu
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$7,255
Cost:
$2,016
- - $7,255 612 - - -
-
kWh
$7,255
612
kW-months/year
-
-
MMBtu
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$262
Cost:
-
$262 4,194 - - - - $262
4,194
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$17,009
Cost:
-
$12,794 204,710 $4,215 355 - - $12,794
204,710
kWh
$4,215
355
kW-months/year
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,567
Cost:
$1,311
- - - - $1,567 362 -
-
kWh
-
-
kW-months/year
$1,567
362
MMBtu
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,798
Cost:
$3,380
- - - - $2,798 646 -
-
kWh
-
-
kW-months/year
$2,798
646
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$734
Cost:
$2,396
$372 5,953 $362 31 - - $372
5,953
kWh
$362
31
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$79,912
Cost:
$10,361
$13,429 214,857 $11,832 997 $54,652 12,621 $13,429
214,857
kWh
$11,832
997
kW-months/year
$54,652
12,621
MMBtu
TOTAL IMPLEMENTED Savings:
$17,272
Cost:
-
$13,056 208,904 $4,215 355 - - $13,056
208,904
kWh
$4,215
355
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas