IAC logo
IAC Assessment: NT0018
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NT0018
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of North Texas
Assessment Year 2023
Principal Product Coating, Engraving and Allied Services
NAICS 332812 - Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479 - Metal Coating And Allied Services
Sales $10,000,000-$50,000,000
# of Employees 81
Plant Area (Sq.Ft.) 771,012
Annual Production 66,769,477 Pounds
Production Hrs. Annual 5,184
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $108,984 1,586,593 kWh $0.07
Electricity Demand $47,204 3,669 kW-months/year $12.87
Electricity Fees $2,301 - $ -
Natural Gas $287,848 71,448 MMBtu $4.03
TOTAL ENERGY COSTS $446,336
RECOMMENDED SAVINGS* $135,620 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,420
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,361
Cost:
$4,553
$1,647 23,967 $714 55 - - - - $1,647
23,967
kWh
$714
55
kW-months/year
-
-
MMBtu
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$35,653
Cost:
$1,258
- - - - $35,653 8,913 - - -
-
kWh
-
-
kW-months/year
$35,653
8,913
MMBtu
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,450
Cost:
$1,311
- - - - $1,450 360 - - -
-
kWh
-
-
kW-months/year
$1,450
360
MMBtu
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$35,420
Cost:
$11,457
$28,187 410,290 $7,233 562 - - - - $28,187
410,290
kWh
$7,233
562
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,528
Cost:
-
$2,461 35,824 $1,067 83 - - - - $2,461
35,824
kWh
$1,067
83
kW-months/year
-
-
MMBtu
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$8,460
Cost:
$6,082
- - $8,460 658 - - - - -
-
kWh
$8,460
658
kW-months/year
-
-
MMBtu
-
-
$
07: 4.231 PURCHASE EQUIPMENT INSTEAD OF LEASING Savings:
$45,600
Cost:
$27,500
- - - - - - $45,600 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$45,600
-
$
08: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,056
Cost:
-
$1,056 15,372 - - - - - - $1,056
15,372
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,092
Cost:
$5,443
$1,080 15,725 $1,012 79 - - - - $1,080
15,725
kWh
$1,012
79
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$135,620
Cost:
$57,604
$34,431 501,178 $18,486 1,437 $37,103 9,273 $45,600 - $34,431
501,178
kWh
$18,486
1,437
kW-months/year
$37,103
9,273
MMBtu
$45,600
-
$
TOTAL IMPLEMENTED Savings:
$35,420
Cost:
$11,457
$28,187 410,290 $7,233 562 - - - - $28,187
410,290
kWh
$7,233
562
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost