IAC Assessment: NT0021
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NT0021
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of North Texas
Assessment Year 2024
Principal Product Injection Molded Plastics
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 72
Plant Area (Sq.Ft.) 65,000
Annual Production 1,670,000 Pieces
Production Hrs. Annual 4,576
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $294,508 3,042,537 kWh $0.10
Electricity Demand $112,485 6,706 kW-months/year $16.77
Electricity Fees $17,136 - $ -
TOTAL ENERGY COSTS $468,565
RECOMMENDED SAVINGS* $168,341 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,801
Cost:
$7,120
$7,104 73,391 $3,697 220 - - - - - - $7,104
73,391
kWh
$3,697
220
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$19,175
Cost:
$6,411
- - $19,175 1,143 - - - - - - -
-
kWh
$19,175
1,143
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,153
Cost:
$11,393
$2,168 22,399 $985 59 - - - - - - $2,168
22,399
kWh
$985
59
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,821
Cost:
$5,609
$4,690 48,449 $2,131 127 - - - - - - $4,690
48,449
kWh
$2,131
127
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$2,130
Cost:
-
$2,130 22,009 - - - - - - - - $2,130
22,009
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
06: 4.812 APPLY FOR INVESTMENT INCENTIVES Savings:
$16,970
Cost:
-
- - - - $16,970 - - - - - -
-
kWh
-
-
kW-months/year
$16,970
-
$
-
-
$
-
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$21,290
Cost:
$19,507
- - - - - - - - $21,290 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$21,290
-
$
08: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$88,000
Cost:
$94,845
- - - - - - $88,000 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$88,000
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$168,341
Cost:
$144,885
$16,093 166,248 $25,988 1,549 $16,970 - $88,000 - $21,290 - $16,093
166,248
kWh
$25,988
1,549
kW-months/year
$16,970
-
$
$88,000
-
$
$21,290
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes One-time Revenue or Avoided Cost