IAC logo
IAC Assessment: NT0024
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NT0024
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of North Texas
Assessment Year 2024
Principal Product sheet metal
NAICS 332322 - Sheet Metal Work Manufacturing
SIC 3469 - Metal Stampings, Nec
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 75,000
Annual Production 100,000 Pieces
Production Hrs. Annual 5,330
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $141,889 1,509,224 kWh $0.09
Electricity Demand $33,857 3,846 kW-months/year $8.80
Electricity Fees $3,878 - $ -
Natural Gas $54,171 15,599 MMBtu $3.47
TOTAL ENERGY COSTS $233,796
RECOMMENDED SAVINGS* $27,942 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,921
Cost:
$5,609
$4,064 43,238 $857 97 - - $4,064
43,238
kWh
$857
97
kW-months/year
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,929
Cost:
$5,415
$5,723 60,883 $1,206 137 - - $5,723
60,883
kWh
$1,206
137
kW-months/year
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,810
Cost:
$1,986
- - $4,810 546 - - -
-
kWh
$4,810
546
kW-months/year
-
-
$
04: 4.812 APPLY FOR INVESTMENT INCENTIVES Savings:
$5,847
Cost:
-
- - - - $5,847 - -
-
kWh
-
-
kW-months/year
$5,847
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,083
Cost:
$5,482
$3,908 41,579 $1,174 133 - - $3,908
41,579
kWh
$1,174
133
kW-months/year
-
-
$
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$351
Cost:
$180
$351 3,739 - - - - $351
3,739
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$27,942
Cost:
$18,672
$14,047 149,439 $8,047 914 $5,847 - $14,047
149,439
kWh
$8,047
914
kW-months/year
$5,847
-
$