Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of North Texas |
---|---|
Assessment Year | 2024 |
Principal Product | Extruded Metal Parts |
NAICS | 331318 - Other Aluminum Rolling, Drawing, and Extruding |
SIC | 3354 - Aluminum Extruded Products |
Sales | $100,000,000-$500,000,000 |
# of Employees | 230 |
Plant Area (Sq.Ft.) | 788,000 |
Annual Production | 6,000,000 Pounds |
Production Hrs. Annual | 7,488 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $3,316,912 | 42,911,700 | kWh | $0.08 |
Electricity Demand | $963,574 | 42,869 | kW-months/year | $22.48 |
Electricity Fees | $137,593 | - | $ | - |
Natural Gas | $1,404,483 | 396,929 | MMBtu | $3.54 |
TOTAL ENERGY COSTS | $5,822,561 | |||
RECOMMENDED SAVINGS* | $397,434 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Electricity Usage | Electricity Demand | Electricity Fees | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $10,160 Cost: $5,609 |
$6,931 | 89,664 | $3,229 | 144 | - | - |
$6,931 89,664 kWh |
$3,229 144 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $22,341 Cost: - |
$15,238 | 197,128 | $7,103 | 316 | - | - |
$15,238 197,128 kWh |
$7,103 316 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $109,656 Cost: $54,987 |
$74,798 | 967,629 | $34,858 | 1,551 | - | - |
$74,798 967,629 kWh |
$34,858 1,551 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $122,072 Cost: $90,330 |
- | - | - | - | $122,072 | - |
- - kWh |
- - kW-months/year |
$122,072 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.812 APPLY FOR INVESTMENT INCENTIVES |
Savings: $133,205 Cost: - |
- | - | - | - | $133,205 | - |
- - kWh |
- - kW-months/year |
$133,205 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $397,434 Cost: $150,926 |
$96,967 | 1,254,421 | $45,190 | 2,010 | $255,277 | - | $96,967 1,254,421 kWh |
$45,190 2,010 kW-months/year |
$255,277 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Electricity Usage | Electricity Demand | Electricity Fees |