IAC logo
IAC Assessment: NT0028
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NT0028
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of North Texas
Assessment Year 2024
Principal Product Electrical motors and Electrical panels manufacturing
NAICS 335313 - Switchgear and Switchboard Apparatus Manufacturing
SIC 3613 - Switchgear And Switchboard Apparatus
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 300,000
Annual Production 100,000 Pieces
Production Hrs. Annual 4,914
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $281,592 2,748,854 kWh $0.10
Electricity Demand $86,348 7,643 kW-months/year $11.30
Electricity Fees $26,775 - $ -
Natural Gas $84,738 101,785 MMBtu $0.83
TOTAL ENERGY COSTS $479,453
RECOMMENDED SAVINGS* $107,513 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,518
Cost:
$5,609
$5,135 50,147 $1,383 122 - - $5,135
50,147
kWh
$1,383
122
kW-months/year
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,367
Cost:
-
$3,440 33,596 $927 82 - - $3,440
33,596
kWh
$927
82
kW-months/year
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$22,571
Cost:
$9,184
$17,316 169,100 $5,255 465 - - $17,316
169,100
kWh
$5,255
465
kW-months/year
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,586
Cost:
$20,775
$10,413 101,687 $3,173 281 - - $10,413
101,687
kWh
$3,173
281
kW-months/year
-
-
$
05: 4.812 APPLY FOR INVESTMENT INCENTIVES Savings:
$27,609
Cost:
$10,000
- - - - $27,609 - -
-
kWh
-
-
kW-months/year
$27,609
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$11,431
Cost:
$6,584
- - $11,431 1,012 - - -
-
kWh
$11,431
1,012
kW-months/year
-
-
$
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$21,431
Cost:
$520
$21,431 209,289 - - - - $21,431
209,289
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$107,513
Cost:
$52,672
$57,735 563,819 $22,169 1,962 $27,609 - $57,735
563,819
kWh
$22,169
1,962
kW-months/year
$27,609
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost