IAC logo
IAC Assessment: NT0029
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NT0029
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of North Texas
Assessment Year 2024
Principal Product Linerboard
NAICS 322130 - Paperboard Mills
SIC 2631 - Paperboard Mills
Sales $100,000,000-$500,000,000
# of Employees 160
Plant Area (Sq.Ft.) 2,200,000
Annual Production 275,000 Tons
Production Hrs. Annual 8,760
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $4,966,982 106,242,169 kWh $0.05
Electricity Demand $1,218,528 170,136 kW-months/year $7.16
Electricity Fees $168,980 - $ -
Natural Gas $3,395,349 927,740 MMBtu $3.66
TOTAL ENERGY COSTS $9,749,840
RECOMMENDED SAVINGS* $262,313 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,179
Cost:
$5,609
$5,108 109,156 $1,071 150 - - $5,108
109,156
kWh
$1,071
150
kW-months/year
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,227
Cost:
$1,819
$6,802 145,341 $1,426 199 - - $6,802
145,341
kWh
$1,426
199
kW-months/year
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$34,386
Cost:
$117,351
- - - - $34,386 - -
-
kWh
-
-
kW-months/year
$34,386
-
$
04: 4.812 APPLY FOR INVESTMENT INCENTIVES Savings:
$204,971
Cost:
$10,000
- - - - $204,971 - -
-
kWh
-
-
kW-months/year
$204,971
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,550
Cost:
$21,900
$7,065 150,958 $1,485 207 - - $7,065
150,958
kWh
$1,485
207
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$262,313
Cost:
$156,679
$18,975 405,454 $3,981 556 $239,357 - $18,975
405,454
kWh
$3,981
556
kW-months/year
$239,357
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees