IAC logo
IAC Assessment: NT0034
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NT0034
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of North Texas
Assessment Year 2024
Principal Product Galvanized steel products
NAICS 331110 - Iron and Steel Mills and Ferroalloy Manufacturing
SIC 3312 - Blast Furnaces And Steel Mills
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 26,800
Annual Production 53,413,636 Units
Production Hrs. Annual 6,240
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $22,791 612,813 kWh $0.04
Electricity Demand $17,938 1,890 kW-months/year $9.49
Electricity Fees $3,169 - $ -
Natural Gas $173,059 88,919 MMBtu $1.95
TOTAL ENERGY COSTS $216,956
RECOMMENDED SAVINGS* $43,100 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas By-product Production Electricity Usage Electricity Demand Electricity Fees Natural Gas By-product Production
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$131
Cost:
$414
$60 1,615 $71 7 - - - - - - $60
1,615
kWh
$71
7
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$249
Cost:
-
$249 6,683 - - - - - - - - $249
6,683
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,040
Cost:
$1,056
$698 18,754 $342 36 - - - - - - $698
18,754
kWh
$342
36
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$4,552
Cost:
$19,950
$2,666 71,679 $1,886 199 - - - - - - $2,666
71,679
kWh
$1,886
199
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,461
Cost:
$1,258
- - - - - - $3,461 1,778 - - -
-
kWh
-
-
kW-months/year
-
-
$
$3,461
1,778
MMBtu
-
-
$
06: 4.812 APPLY FOR INVESTMENT INCENTIVES Savings:
$3,553
Cost:
$5,000
- - - - $3,553 - - - - - -
-
kWh
-
-
kW-months/year
$3,553
-
$
-
-
MMBtu
-
-
$
07: 4.132 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST Savings:
$30,115
Cost:
$80,000
- - - - - - $865 445 $29,250 - -
-
kWh
-
-
kW-months/year
-
-
$
$865
445
MMBtu
$29,250
-
$
TOTAL RECOMMENDED Savings:
$43,100
Cost:
$107,678
$3,673 98,731 $2,299 242 $3,553 - $4,326 2,223 $29,250 - $3,673
98,731
kWh
$2,299
242
kW-months/year
$3,553
-
$
$4,326
2,223
MMBtu
$29,250
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas By-product Production Electricity Usage Electricity Demand Electricity Fees Natural Gas By-product Production