IAC logo
IAC Assessment: NT0048
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NT0048
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of North Texas
Assessment Year 2025
Principal Product Integrated Racks
NAICS 334419 - Other Electronic Component Manufacturing
SIC 3672 - Printed Circuit Boards
Sales $100,000,000-$500,000,000
# of Employees 500
Plant Area (Sq.Ft.) 844,000
Annual Production 20,000 Units
Production Hrs. Annual 4,680
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $554,353 16,456,613 kWh $0.03
Electricity Demand $245,126 30,205 kW-months/year $8.12
Electricity Fees $124,939 - $ -
Natural Gas $76,791 7,909 MMBtu $9.71
TOTAL ENERGY COSTS $1,001,209
RECOMMENDED SAVINGS* $377,736 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,298
Cost:
-
$1,728 51,269 $570 70 - - - - - - $1,728
51,269
kWh
$570
70
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,633
Cost:
$5,609
$8,769 257,646 $2,864 353 - - - - - - $8,769
257,646
kWh
$2,864
353
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$998
Cost:
$1,346
- - - - - - $998 103 - - -
-
kWh
-
-
kW-months/year
-
-
$
$998
103
MMBtu
-
-
$
04: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$13,913
Cost:
$73,500
$1,795 53,277 $589 73 - - $11,528 1,187 - - $1,795
53,277
kWh
$589
73
kW-months/year
-
-
$
$11,528
1,187
MMBtu
-
-
$
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$20,312
Cost:
$55,710
$14,667 435,212 $5,646 695 - - - - - - $14,667
435,212
kWh
$5,646
695
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$7,122
Cost:
$25,622
- - - - $7,122 - - - - - -
-
kWh
-
-
kW-months/year
$7,122
-
$
-
-
MMBtu
-
-
$
07: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$321,458
Cost:
$5,000
- - - - $80,365 - - - $241,094 - -
-
kWh
-
-
kW-months/year
$80,365
-
$
-
-
MMBtu
$241,094
-
$
TOTAL RECOMMENDED Savings:
$377,736
Cost:
$166,787
$26,959 797,404 $9,669 1,191 $87,487 - $12,527 1,291 $241,094 - $26,959
797,404
kWh
$9,669
1,191
kW-months/year
$87,487
-
$
$12,527
1,291
MMBtu
$241,094
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost