IAC logo
IAC Assessment: NV0006
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0006
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1994
Principal Product Laser Equipment
NAICS n/a
SIC 3827 - Optical Instruments And Lenses
Sales $10,000,000-$50,000,000
# of Employees 400
Plant Area (Sq.Ft.) 105,000
Annual Production 21,500 Pieces
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $384,791 5,498,242 kWh $0.07
Natural Gas $27,614 4,864 MMBtu $5.68
TOTAL ENERGY COSTS $412,405
RECOMMENDED SAVINGS* $8,596 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,657
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,709
Cost:
$(-175)
$3,709 53,341 - - $3,709
53,341
kWh
-
-
MMBtu
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$2,218
Cost:
$3,780
- - $2,218 378 -
-
kWh
$2,218
378
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$914
Cost:
$454
$914 12,016 - - $914
12,016
kWh
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$554
Cost:
$240
$554 7,913 - - $554
7,913
kWh
-
-
MMBtu
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$807
Cost:
$2,250
$807 - - - $807
-
kWh
-
-
MMBtu
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$394
Cost:
$30
$394 5,569 - - $394
5,569
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$8,596
Cost:
$6,579
$6,378 78,839 $2,218 378 $6,378
78,839
kWh
$2,218
378
MMBtu
TOTAL IMPLEMENTED Savings:
$4,657
Cost:
$95
$4,657 66,823 - - $4,657
66,823
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas