Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1995
Principal Product Wood Strips and Mouldings
NAICS n/a
SIC 2431 - Millwork
Sales $5,000,000-$10,000,000
# of Employees 70
Plant Area (Sq.Ft.) 70,000
Annual Production 9,600,000 Units
Production Hrs. Annual 1,700
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $254,108 2,100,528 kWh $0.12
TOTAL ENERGY COSTS $254,108
RECOMMENDED SAVINGS* $15,867 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,213
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,750
Cost:
$688
$2,750 23,154 $2,750
23,154
kWh
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,654
Cost:
$5,355
$2,654 - $2,654
-
kWh
03: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$4,969
Cost:
$275
$4,969 41,911 $4,969
41,911
kWh
04: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$1,474
Cost:
$280
$1,474 12,603 $1,474
12,603
kWh
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$652
Cost:
$240
$652 9,965 $652
9,965
kWh
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,088
Cost:
$192
$1,088 13,189 $1,088
13,189
kWh
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,280
Cost:
-
$2,280 34,877 $2,280
34,877
kWh
TOTAL RECOMMENDED Savings:
$15,867
Cost:
$7,030
$15,867 135,699 $15,867
135,699
kWh
TOTAL IMPLEMENTED Savings:
$13,213
Cost:
$1,675
$13,213 135,699 $13,213
135,699
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage