IAC logo
IAC Assessment: NV0051
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0051
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1996
Principal Product recreational motor homes
NAICS n/a
SIC 3716 - Motor Homes
Sales $100,000,000-$500,000,000
# of Employees 325
Plant Area (Sq.Ft.) 120,000
Annual Production 2,500 Pieces
Production Hrs. Annual 2,431
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $135,691 1,735,639 kWh $0.08
Electricity Demand $85,483 6,646 kW-months/year $12.86
Electricity Fees $2,100 - $ -
Natural Gas $43,480 6,016 MMBtu $7.23
TOTAL ENERGY COSTS $291,324
RECOMMENDED SAVINGS* $21,706 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,159
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$469
Cost:
$81
$248 3,224 $221 17 - - - - $248
3,224
kWh
$221
17
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$727
Cost:
$1,625
- - - - $727 113 - - -
-
kWh
-
-
kW-months/year
$727
113
MMBtu
-
-
lb
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$930
Cost:
$300
$930 12,016 - - - - - - $930
12,016
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$820
Cost:
-
$820 10,551 - - - - - - $820
10,551
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$185
Cost:
-
$103 1,465 $82 16 - - - - $103
1,465
kWh
$82
16
kW-months/year
-
-
MMBtu
-
-
lb
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$18,575
Cost:
$17,350
- - - - - - $18,575 54,600 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$18,575
54,600
lb
TOTAL RECOMMENDED Savings:
$21,706
Cost:
$19,356
$2,101 27,256 $303 33 $727 113 $18,575 54,600 $2,101
27,256
kWh
$303
33
kW-months/year
$727
113
MMBtu
$18,575
54,600
lb
TOTAL IMPLEMENTED Savings:
$20,159
Cost:
$17,731
$1,281 16,705 $303 33 - - $18,575 54,600 $1,281
16,705
kWh
$303
33
kW-months/year
-
-
MMBtu
$18,575
54,600
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)