IAC logo
IAC Assessment: NV0064
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0064
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1996
Principal Product Custom Elecronic Fittings
NAICS n/a
SIC 3444 - Sheet Metalwork
Sales $10,000,000-$50,000,000
# of Employees 46
Plant Area (Sq.Ft.) 60,000
Annual Production 200,000,000 Pieces
Production Hrs. Annual 7,826
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $60,151 1,338,804 kWh $0.04
Electricity Demand $35,875 3,844 kW-months/year $9.33
Electricity Fees $1,800 - $ -
Natural Gas $4,376 865 MMBtu $5.06
TOTAL ENERGY COSTS $102,202
RECOMMENDED SAVINGS* $51,964 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $49,128
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$382
Cost:
$758
$260 5,862 $122 13 - - $260
5,862
kWh
$122
13
kW-months/year
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,281
Cost:
$268
$1,542 29,601 $739 79 - - $1,542
29,601
kWh
$739
79
kW-months/year
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$552
Cost:
$491
$552 10,551 - - - - $552
10,551
kWh
-
-
kW-months/year
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$194
Cost:
$230
$194 4,396 - - - - $194
4,396
kWh
-
-
kW-months/year
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$555
Cost:
$790
$555 12,309 - - - - $555
12,309
kWh
-
-
kW-months/year
-
-
$
06: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$48,000
Cost:
$189,800
- - - - $48,000 - -
-
kWh
-
-
kW-months/year
$48,000
-
$
TOTAL RECOMMENDED Savings:
$51,964
Cost:
$192,337
$3,103 62,719 $861 92 $48,000 - $3,103
62,719
kWh
$861
92
kW-months/year
$48,000
-
$
TOTAL IMPLEMENTED Savings:
$49,128
Cost:
$191,279
$1,006 20,809 $122 13 $48,000 - $1,006
20,809
kWh
$122
13
kW-months/year
$48,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes