IAC logo
IAC Assessment: NV0066
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0066
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1996
Principal Product Printed Paper Products
NAICS n/a
SIC 2679 - Converted Paper Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 140,000
Annual Production 17,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $88,674 2,031,946 kWh $0.04
Electricity Demand $48,707 5,286 kW-months/year $9.21
Electricity Fees $3,460 - $ -
Natural Gas $21,825 4,215 MMBtu $5.18
TOTAL ENERGY COSTS $165,766
RECOMMENDED SAVINGS* $16,753 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,418
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ $ $ MMBtu $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$90
Cost:
$31
$66 1,465 $24 2 - - - - - - $66
1,465
kWh
$24
2
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,307
Cost:
$270
$1,307 30,188 - - - - - - - - $1,307
30,188
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,462
Cost:
$200
$1,462 33,705 - - - - - - - - $1,462
33,705
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$4,678
Cost:
$11,375
- - - - - - $4,678 1,015 - - -
-
kWh
-
-
kW-months/year
-
-
$
$4,678
1,015
MMBtu
-
-
lb
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$245
Cost:
$94
$245 4,396 - - - - - - - - $245
4,396
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$657
Cost:
$1,760
- - - - $657 - - - - - -
-
kWh
-
-
kW-months/year
$657
-
$
-
-
MMBtu
-
-
lb
07: 2.2447 HEAT WATER WITH EXHAUST HEAT Savings:
$5,214
Cost:
$3,300
$253 5,862 $82 9 - - $4,879 930 - - $253
5,862
kWh
$82
9
kW-months/year
-
-
$
$4,879
930
MMBtu
-
-
lb
08: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$3,100
Cost:
-
- - - - - - - - $3,100 5,000 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$3,100
5,000
lb
TOTAL RECOMMENDED Savings:
$16,753
Cost:
$17,030
$3,333 75,616 $106 11 $657 - $9,557 1,945 $3,100 5,000 $3,333
75,616
kWh
$106
11
kW-months/year
$657
-
$
$9,557
1,945
MMBtu
$3,100
5,000
lb
TOTAL IMPLEMENTED Savings:
$11,418
Cost:
$3,895
$3,333 75,616 $106 11 - - $4,879 930 $3,100 5,000 $3,333
75,616
kWh
$106
11
kW-months/year
-
-
$
$4,879
930
MMBtu
$3,100
5,000
lb
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz)