IAC logo
IAC Assessment: NV0072
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0072
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1996
Principal Product Beer and Ale
NAICS n/a
SIC 2082 - Malt Beverages
Sales $10,000,000-$50,000,000
# of Employees 68
Plant Area (Sq.Ft.) 78,000
Annual Production 250,000 BBL
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $225,175 2,981,536 kWh $0.08
Electricity Demand $32,238 7,599 kW-months/year $4.24
Electricity Fees $17,198 - $ -
Natural Gas $167,491 32,128 MMBtu $5.21
TOTAL ENERGY COSTS $442,248
RECOMMENDED SAVINGS* $79,118 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,435
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Primary Raw Material
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$11,359
Cost:
$766
$10,362 121,043 $560 132 $437 - - - - - - - $10,362
121,043
kWh
$560
132
kW-months/year
$437
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,715
Cost:
$200
$1,649 19,343 - - $66 - - - - - - - $1,649
19,343
kWh
-
-
kW-months/year
$66
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.7134 USE PHOTOCELL CONTROLS Savings:
$795
Cost:
$156
$723 8,499 $41 10 $31 - - - - - - - $723
8,499
kWh
$41
10
kW-months/year
$31
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,438
Cost:
$558
$4,012 46,893 $255 60 $171 - - - - - - - $4,012
46,893
kWh
$255
60
kW-months/year
$171
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$349
Cost:
$240
$336 3,810 - - $13 - - - - - - - $336
3,810
kWh
-
-
kW-months/year
$13
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,021
Cost:
-
$982 11,430 - - $39 - - - - - - - $982
11,430
kWh
-
-
kW-months/year
$39
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$5,739
Cost:
-
- - $(-67,204) - $72,943 - - - - - - - -
-
kWh
$(-67,204)
-
kW-months/year
$72,943
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,756
Cost:
$890
- - - - - - $6,756 1,296 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$6,756
1,296
MMBtu
-
-
Tgal
-
-
$
09: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION Savings:
$46,800
Cost:
$600
- - - - - - - - - - $46,800 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$46,800
-
$
10: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$146
Cost:
$23
- - - - - - - - $146 210,240 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$146
210,240
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$79,118
Cost:
$3,433
$18,064 211,018 $(-66,348) 202 $73,700 - $6,756 1,296 $146 210,240 $46,800 - $18,064
211,018
kWh
$(-66,348)
202
kW-months/year
$73,700
-
$
$6,756
1,296
MMBtu
$146
210,240
Tgal
$46,800
-
$
TOTAL IMPLEMENTED Savings:
$25,435
Cost:
$2,437
$17,005 198,709 $815 192 $713 - $6,756 1,296 $146 210,240 - - $17,005
198,709
kWh
$815
192
kW-months/year
$713
-
$
$6,756
1,296
MMBtu
$146
210,240
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Primary Raw Material