Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Nevada |
---|---|
Assessment Year | 1997 |
Principal Product | Custom Moulded Plastic Products |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 850,000 Pounds |
Production Hrs. Annual | 7,488 |
Location (State) | NV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $71,325 | 1,594,959 | kWh | $0.04 |
Electricity Demand | $43,621 | 4,883 | kW-months/year | $8.93 |
Electricity Fees | $878 | - | $ | - |
Natural Gas | $1,955 | 308 | MMBtu | $6.35 |
TOTAL ENERGY COSTS | $117,779 | |||
RECOMMENDED SAVINGS* | $57,193 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $45,725 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $8,983 Cost: $1,120 |
$6,804 | 152,110 | $2,179 | 244 | - | - | - | - | - | - |
$6,804 152,110 kWh |
$2,179 244 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,478 Cost: $300 |
$1,478 | 33,118 | - | - | - | - | - | - | - | - |
$1,478 33,118 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $353 Cost: $404 |
$268 | 6,155 | $85 | 10 | - | - | - | - | - | - |
$268 6,155 kWh |
$85 10 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $1,293 Cost: $2,925 |
$(-135) | (-2,931) | $(-44) | (-5) | $1,472 | 286 | - | - | - | - |
$(-135) (-2,931) kWh |
$(-44) (-5) kW-months/year |
$1,472 286 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $1,167 Cost: $815 |
- | - | - | - | $1,167 | 227 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,167 227 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $839 Cost: $50 |
$839 | 18,757 | - | - | - | - | - | - | - | - |
$839 18,757 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $8,002 Cost: $250 |
- | - | - | - | - | - | $8,002 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$8,002 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $78 Cost: - |
- | - | - | - | - | - | $78 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$78 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES |
Savings: $35,000 Cost: $28,000 |
- | - | - | - | - | - | - | - | $35,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$35,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $57,193 Cost: $33,864 |
$9,254 | 207,209 | $2,220 | 249 | $2,639 | 513 | $8,080 | - | $35,000 | - | $9,254 207,209 kWh |
$2,220 249 kW-months/year |
$2,639 513 MMBtu |
$8,080 - lb |
$35,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $45,725 Cost: $29,365 |
$1,478 | 33,118 | - | - | $1,167 | 227 | $8,080 | - | $35,000 | - | $1,478 33,118 kWh |
- - kW-months/year |
$1,167 227 MMBtu |
$8,080 - lb |
$35,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Primary Raw Material |