IAC logo
IAC Assessment: NV0098
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0098
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1998
Principal Product Asphalt & Concrete Aggregates
NAICS n/a
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 0
Annual Production 3,500,000 Tons
Production Hrs. Annual 4,653
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $514,814 9,847,304 kWh $0.05
Electricity Demand $325,103 45,330 kW-months/year $7.17
Electricity Fees $29,371 - $ -
Natural Gas $341,499 137,653 MMBtu $2.48
TOTAL ENERGY COSTS $1,211,398
RECOMMENDED SAVINGS* $496,910 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$215
Cost:
$58
$209 4,103 - - $6 - - - - - $209
4,103
kWh
-
-
kW-months/year
$6
-
$
-
-
MMBtu
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$768
Cost:
$661
$746 14,361 - - $22 - - - - - $746
14,361
kWh
-
-
kW-months/year
$22
-
$
-
-
MMBtu
-
-
$
03: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS Savings:
$9,263
Cost:
$30,000
- - - - - - $9,263 3,735 - - -
-
kWh
-
-
kW-months/year
-
-
$
$9,263
3,735
MMBtu
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$289
Cost:
$416
- - - - - - $289 116 - - -
-
kWh
-
-
kW-months/year
-
-
$
$289
116
MMBtu
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,645
Cost:
$4,179
$2,046 39,273 $527 74 $72 - - - - - $2,046
39,273
kWh
$527
74
kW-months/year
$72
-
$
-
-
MMBtu
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$522
Cost:
$50
$507 9,672 - - $15 - - - - - $507
9,672
kWh
-
-
kW-months/year
$15
-
$
-
-
MMBtu
-
-
$
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$5,436
Cost:
$175
$5,284 101,114 - - $152 - - - - - $5,284
101,114
kWh
-
-
kW-months/year
$152
-
$
-
-
MMBtu
-
-
$
08: 4.425 ELIMINATE/REDUCE REDUNDANT INSPECTIONS Savings:
$477,397
Cost:
$1,400,000
- - - - - - - - $477,397 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$477,397
-
$
09: 3.4151 MINIMIZE WATER USAGE Savings:
$375
Cost:
$800
$141 2,638 $224 31 $10 - - - - - $141
2,638
kWh
$224
31
kW-months/year
$10
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$496,910
Cost:
$1,436,339
$8,933 171,161 $751 105 $277 - $9,552 3,851 $477,397 - $8,933
171,161
kWh
$751
105
kW-months/year
$277
-
$
$9,552
3,851
MMBtu
$477,397
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes