IAC logo
IAC Assessment: NV0109
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0109
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1998
Principal Product Ready Mix Concrete
NAICS n/a
SIC 3273 - Ready-mixed Concrete
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 0
Annual Production 200,000 Units
Production Hrs. Annual 4,623
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $8,514 191,676 kWh $0.04
Electricity Demand $18,514 1,937 kW-months/year $9.56
Electricity Fees $1,869 - $ -
Natural Gas $31,240 6,026 MMBtu $5.18
TOTAL ENERGY COSTS $60,137
RECOMMENDED SAVINGS* $72,516 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,823
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ lb $ $ $ $ $ $
01: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$686
Cost:
$550
- - - - - - $686 133 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$686
133
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,687
Cost:
$1,076
$871 20,809 $782 84 $34 - - - - - - - - - - - - - $871
20,809
kWh
$782
84
kW-months/year
$34
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,155
Cost:
$4,348
$1,646 39,273 $1,447 156 $62 - - - - - - - - - - - - - $1,646
39,273
kWh
$1,447
156
kW-months/year
$62
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,204
Cost:
-
$1,370 32,825 $791 85 $43 - - - - - - - - - - - - - $1,370
32,825
kWh
$791
85
kW-months/year
$43
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$349
Cost:
$150
$84 2,052 $241 26 $24 - - - - - - - - - - - - - $84
2,052
kWh
$241
26
kW-months/year
$24
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$776
Cost:
$157
$483 11,430 $278 30 $15 - - - - - - - - - - - - - $483
11,430
kWh
$278
30
kW-months/year
$15
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$353
Cost:
-
$225 5,275 $121 13 $7 - - - - - - - - - - - - - $225
5,275
kWh
$121
13
kW-months/year
$7
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
08: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$6,552
Cost:
$233
- - - - - - - - - - - - $6,552 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
$6,552
-
$
-
-
$
-
-
$
09: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$15,147
Cost:
$60,500
- - - - - - - - - - - - $15,147 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
$15,147
-
$
-
-
$
-
-
$
10: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$120
Cost:
$150
- - - - - - - - $120 54,750 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$120
54,750
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
11: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE Savings:
$4,175
Cost:
$40,550
- - - - - - - - - - - - - - $4,175 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$4,175
-
$
-
-
$
12: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$35,819
Cost:
$1,000
- - - - - - - - $2,981 1,365,000 - - $64,260 - - - $(-31,422) - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$2,981
1,365,000
Tgal
-
-
lb
$64,260
-
$
-
-
$
$(-31,422)
-
$
13: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,493
Cost:
-
- - - - - - - - - - $1,493 2,280 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$1,493
2,280
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$72,516
Cost:
$108,714
$4,679 111,664 $3,660 394 $185 - $686 133 $3,101 1,419,750 $1,493 2,280 $85,959 - $4,175 - $(-31,422) - $4,679
111,664
kWh
$3,660
394
kW-months/year
$185
-
$
$686
133
MMBtu
$3,101
1,419,750
Tgal
$1,493
2,280
lb
$85,959
-
$
$4,175
-
$
$(-31,422)
-
$
TOTAL IMPLEMENTED Savings:
$10,823
Cost:
$6,431
$4,679 111,664 $3,660 394 $185 - $686 133 $120 54,750 $1,493 2,280 - - - - - - $4,679
111,664
kWh
$3,660
394
kW-months/year
$185
-
$
$686
133
MMBtu
$120
54,750
Tgal
$1,493
2,280
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost