IAC logo
IAC Assessment: NV0110
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0110
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1998
Principal Product Ready Mix Concrete
NAICS n/a
SIC 3273 - Ready-mixed Concrete
Sales $10,000,000-$50,000,000
# of Employees 57
Plant Area (Sq.Ft.) 0
Annual Production 164,863 Units
Production Hrs. Annual 3,588
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $13,494 182,591 kWh $0.07
Electricity Demand $12,212 1,316 kW-months/year $9.28
Electricity Fees $1,236 - $ -
Natural Gas $9,873 1,880 MMBtu $5.25
TOTAL ENERGY COSTS $36,815
RECOMMENDED SAVINGS* $25,654 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Personnel Changes Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $ $ $ $ $
01: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$346
Cost:
$133
- - - - - - $346 67 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$346
67
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
02: 2.1224 REPLACE BOILER Savings:
$3,636
Cost:
$17,539
- - - - - - $3,636 700 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$3,636
700
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$450
Cost:
$1,239
$210 4,689 $231 25 $9 - - - - - - - - - - - $210
4,689
kWh
$231
25
kW-months/year
$9
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$721
Cost:
$2,864
$349 6,448 $358 40 $14 - - - - - - - - - - - $349
6,448
kWh
$358
40
kW-months/year
$14
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
05: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$6,200
Cost:
$140
- - - - - - - - - - $1,872 - $4,328 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$1,872
-
$
$4,328
-
$
-
-
$
06: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$877
Cost:
$100
- - - - - - - - $877 385,002 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$877
385,002
Tgal
-
-
$
-
-
$
-
-
$
07: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$3,073
Cost:
$193
- - - - - - - - $3,073 1,407,000 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$3,073
1,407,000
Tgal
-
-
$
-
-
$
-
-
$
08: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$10,351
Cost:
$1,000
- - - - - - - - $2,555 1,170,000 $30,240 - - - $(-22,444) - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$2,555
1,170,000
Tgal
$30,240
-
$
-
-
$
$(-22,444)
-
$
TOTAL RECOMMENDED Savings:
$25,654
Cost:
$23,208
$559 11,137 $589 65 $23 - $3,982 767 $6,505 2,962,002 $32,112 - $4,328 - $(-22,444) - $559
11,137
kWh
$589
65
kW-months/year
$23
-
$
$3,982
767
MMBtu
$6,505
2,962,002
Tgal
$32,112
-
$
$4,328
-
$
$(-22,444)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Personnel Changes Primary Raw Material Ancillary Material Cost