IAC Assessment: NV0115
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0115
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1998
Principal Product Industrial Absorbent
NAICS n/a
SIC 3295 - Minerals, Ground Or Treated
Sales $5,000,000-$10,000,000
# of Employees 55
Plant Area (Sq.Ft.) 80,000
Annual Production 52,440 Tons
Production Hrs. Annual 6,240
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $92,734 2,214,537 kWh $0.04
Electricity Demand $48,921 5,653 kW-months/year $8.65
Electricity Fees $791 - $ -
Fuel Oil #2 $27,728 16,878 MMBtu $1.64
TOTAL ENERGY COSTS $170,174
RECOMMENDED SAVINGS* $439,969 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $75,705
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ $ $ lb $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,772
Cost:
$2,333
- - - - $1,772 - - - - - -
-
kWh
-
-
kW-months/year
$1,772
-
$
-
-
lb
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,392
Cost:
$1,226
$2,441 58,324 $999 116 $(-48) - - - - - $2,441
58,324
kWh
$999
116
kW-months/year
$(-48)
-
$
-
-
lb
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,937
Cost:
$10,398
$3,541 84,701 $1,465 170 $(-69) - - - - - $3,541
84,701
kWh
$1,465
170
kW-months/year
$(-69)
-
$
-
-
lb
-
-
$
04: 4.446 AUTOMATE FINISHING PROCESS Savings:
$68,996
Cost:
$19,100
$(-184) (-4,396) $565 (-66) $(-25) - - - $68,640 - $(-184)
(-4,396)
kWh
$565
(-66)
kW-months/year
$(-25)
-
$
-
-
lb
$68,640
-
$
05: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$358,805
Cost:
$198,720
$(-655) (-15,533) $(-10) (-1) $7 - - - $359,463 - $(-655)
(-15,533)
kWh
$(-10)
(-1)
kW-months/year
$7
-
$
-
-
lb
$359,463
-
$
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,067
Cost:
-
- - - - - - $2,067 52,000 - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,067
52,000
lb
-
-
$
TOTAL RECOMMENDED Savings:
$439,969
Cost:
$231,777
$5,143 123,096 $3,019 219 $1,637 - $2,067 52,000 $428,103 - $5,143
123,096
kWh
$3,019
219
kW-months/year
$1,637
-
$
$2,067
52,000
lb
$428,103
-
$
TOTAL IMPLEMENTED Savings:
$75,705
Cost:
$31,831
$3,357 80,305 $2,030 104 $1,678 - - - $68,640 - $3,357
80,305
kWh
$2,030
104
kW-months/year
$1,678
-
$
-
-
lb
$68,640
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes