IAC logo
IAC Assessment: NV0116
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0116
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1998
Principal Product Structural Wood Members
NAICS n/a
SIC 2439 - Structural Wood Members, Nec
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 29,500
Annual Production 5,000,000 Pieces
Production Hrs. Annual 4,485
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $12,431 297,773 kWh $0.04
Electricity Demand $8,892 958 kW-months/year $9.28
Electricity Fees $607 - $ -
Natural Gas $2,723 403 MMBtu $6.76
Fuel Oil #2 $64,127 6,860 MMBtu $9.35
TOTAL ENERGY COSTS $88,780
RECOMMENDED SAVINGS* $15,634 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $931
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$123
Cost:
-
$78 1,758 $45 5 - - - - $78
1,758
kWh
$45
5
kW-months/year
-
-
lb
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$808
Cost:
$200
$204 4,982 $604 65 - - - - $204
4,982
kWh
$604
65
kW-months/year
-
-
lb
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,657
Cost:
$12,973
$1,925 46,014 $732 79 - - - - $1,925
46,014
kWh
$732
79
kW-months/year
-
-
lb
-
-
$
04: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$11,871
Cost:
$50,000
- - - - - - $11,871 - -
-
kWh
-
-
kW-months/year
-
-
lb
$11,871
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$175
Cost:
-
- - - - $175 8,640 - - -
-
kWh
-
-
kW-months/year
$175
8,640
lb
-
-
$
TOTAL RECOMMENDED Savings:
$15,634
Cost:
$63,173
$2,207 52,754 $1,381 149 $175 8,640 $11,871 - $2,207
52,754
kWh
$1,381
149
kW-months/year
$175
8,640
lb
$11,871
-
$
TOTAL IMPLEMENTED Savings:
$931
Cost:
$200
$282 6,740 $649 70 - - - - $282
6,740
kWh
$649
70
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $