IAC Assessment: NV0125
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0125
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1999
Principal Product Newspapers
NAICS n/a
SIC 2711 - Newspapers
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 18,000
Annual Production 5,304,000 Pieces
Production Hrs. Annual 3,744
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $35,162 427,608 kWh $0.08
Electricity Demand $6,635 1,529 kW-months/year $4.34
Electricity Fees $986 - $ -
Natural Gas $4,979 749 MMBtu $6.65
TOTAL ENERGY COSTS $47,762
RECOMMENDED SAVINGS* $119,408 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $93,329
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$640
Cost:
$640
$475 5,862 $165 38 - - - - - - - - $475
5,862
kWh
$165
38
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$354
Cost:
$110
$353 4,396 - - $1 - - - - - - - $353
4,396
kWh
-
-
kW-months/year
$1
-
$
-
-
$
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$158
Cost:
-
$105 1,172 $53 12 - - - - - - - - $105
1,172
kWh
$53
12
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$701
Cost:
$825
$470 5,862 $230 53 $1 - - - - - - - $470
5,862
kWh
$230
53
kW-months/year
$1
-
$
-
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,223
Cost:
$6,789
$4,500 54,807 $712 164 $11 - - - - - - - $4,500
54,807
kWh
$712
164
kW-months/year
$11
-
$
-
-
$
-
-
$
-
-
$
06: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$24,200
Cost:
$102,400
- - - - - - - - $24,200 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$24,200
-
$
-
-
$
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$860
Cost:
-
- - - - - - - - $860 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$860
-
$
-
-
$
08: 3.8214 USE WATER-BASED DEVELOPERS AND FINISHERS Savings:
$160
Cost:
-
- - - - - - - - $160 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$160
-
$
-
-
$
09: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$74,476
Cost:
$250,000
- - - - - - - - $20,476 - $54,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$20,476
-
$
$54,000
-
$
10: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$12,636
Cost:
$55,000
- - - - - - $12,636 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$12,636
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$119,408
Cost:
$415,764
$5,903 72,099 $1,160 267 $13 - $12,636 - $45,696 - $54,000 - $5,903
72,099
kWh
$1,160
267
kW-months/year
$13
-
$
$12,636
-
$
$45,696
-
$
$54,000
-
$
TOTAL IMPLEMENTED Savings:
$93,329
Cost:
$312,539
$5,328 65,065 $877 202 $12 - $12,636 - $20,476 - $54,000 - $5,328
65,065
kWh
$877
202
kW-months/year
$12
-
$
$12,636
-
$
$20,476
-
$
$54,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Primary Raw Material