IAC logo
IAC Assessment: NV0128
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0128
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1999
Principal Product Canned Olives
NAICS n/a
SIC 2035 - Pickles, Sauces, And Salad Dressings
Sales $100,000,000-$500,000,000
# of Employees 350
Plant Area (Sq.Ft.) 0
Annual Production 45,000 Tons
Production Hrs. Annual 6,552
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $829,327 13,547,773 kWh $0.06
Electricity Demand $299,053 27,193 kW-months/year $11.00
Electricity Fees $(-8,214) - $ -
Natural Gas $340,372 99,273 MMBtu $3.43
TOTAL ENERGY COSTS $1,460,538
RECOMMENDED SAVINGS* $263,886 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,114
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$21,114
Cost:
$38,248
- - - - - - $21,114 6,157 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$21,114
6,157
MMBtu
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$67,624
Cost:
$122,252
$56,336 759,672 $11,138 11,138 $150 - - - - - - - $56,336
759,672
kWh
$11,138
11,138
kW-months/year
$150
-
$
-
-
MMBtu
-
-
lb
-
-
$
03: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$45,418
Cost:
$62,000
- - - - - - - - $45,418 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$45,418
-
lb
-
-
$
04: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$129,730
Cost:
$188,500
- - - - - - - - - - $129,730 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
$129,730
-
$
TOTAL RECOMMENDED Savings:
$263,886
Cost:
$411,000
$56,336 759,672 $11,138 11,138 $150 - $21,114 6,157 $45,418 - $129,730 - $56,336
759,672
kWh
$11,138
11,138
kW-months/year
$150
-
$
$21,114
6,157
MMBtu
$45,418
-
lb
$129,730
-
$
TOTAL IMPLEMENTED Savings:
$21,114
Cost:
$38,248
- - - - - - $21,114 6,157 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$21,114
6,157
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes