IAC logo
IAC Assessment: NV0133
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0133
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1999
Principal Product Packaging Paper & Plastic
NAICS n/a
SIC 2671 - Paper Coated & Laminated, Packaging
Sales $10,000,000-$50,000,000
# of Employees 57
Plant Area (Sq.Ft.) 25,000
Annual Production 10,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $72,109 1,728,019 kWh $0.04
Electricity Demand $38,057 4,101 kW-months/year $9.28
Electricity Fees $5,999 - $ -
Natural Gas $68,106 13,178 MMBtu $5.17
TOTAL ENERGY COSTS $184,271
RECOMMENDED SAVINGS* $75,199 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,758
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 2.1224 REPLACE BOILER Savings:
$20,745
Cost:
$14,694
- - - - - - $2,189 425 - - $18,556 - -
-
kWh
-
-
kW-months/year
-
-
$
$2,189
425
MMBtu
-
-
$
$18,556
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,872
Cost:
$5,370
$2,370 35,756 - - $1,502 - - - - - - - $2,370
35,756
kWh
-
-
kW-months/year
$1,502
-
$
-
-
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$38,194
Cost:
$38,194
$26,228 628,664 $11,217 1,209 $749 - - - - - - - $26,228
628,664
kWh
$11,217
1,209
kW-months/year
$749
-
$
-
-
MMBtu
-
-
$
-
-
$
04: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$6,458
Cost:
$7,275
- - - - - - $6,458 1,253 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$6,458
1,253
MMBtu
-
-
$
-
-
$
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$4,917
Cost:
$9,200
$(-224) (-5,275) $(-69) (-7) $(-6) - $5,216 1,012 - - - - $(-224)
(-5,275)
kWh
$(-69)
(-7)
kW-months/year
$(-6)
-
$
$5,216
1,012
MMBtu
-
-
$
-
-
$
06: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$1,013
Cost:
-
- - - - - - - - $1,013 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$1,013
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$75,199
Cost:
$74,733
$28,374 659,145 $11,148 1,202 $2,245 - $13,863 2,690 $1,013 - $18,556 - $28,374
659,145
kWh
$11,148
1,202
kW-months/year
$2,245
-
$
$13,863
2,690
MMBtu
$1,013
-
$
$18,556
-
$
TOTAL IMPLEMENTED Savings:
$21,758
Cost:
$14,694
- - - - - - $2,189 425 $1,013 - $18,556 - -
-
kWh
-
-
kW-months/year
-
-
$
$2,189
425
MMBtu
$1,013
-
$
$18,556
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes One-time Revenue or Avoided Cost