IAC logo
IAC Assessment: NV0137
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0137
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1999
Principal Product Machine Parts
NAICS n/a
SIC 3451 - Screw Machine Products
Sales $5,000,000-$10,000,000
# of Employees 70
Plant Area (Sq.Ft.) 27,000
Annual Production 12,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $27,885 668,230 kWh $0.04
Electricity Demand $15,423 1,662 kW-months/year $9.28
Electricity Fees $1,988 - $ -
Natural Gas $7,656 1,420 MMBtu $5.39
TOTAL ENERGY COSTS $52,952
RECOMMENDED SAVINGS* $31,257 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,960
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,544
Cost:
$1,000
- - - - - - $1,544 299 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,544
299
MMBtu
-
-
lb
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$372
Cost:
$300
$202 4,689 $163 18 $7 - - - - - - - $202
4,689
kWh
$163
18
kW-months/year
$7
-
$
-
-
MMBtu
-
-
lb
-
-
$
03: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$198
Cost:
$25
$143 3,517 $51 6 $4 - - - - - - - $143
3,517
kWh
$51
6
kW-months/year
$4
-
$
-
-
MMBtu
-
-
lb
-
-
$
04: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$2,377
Cost:
$4,576
- - - - - - $2,377 461 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,377
461
MMBtu
-
-
lb
-
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$376
Cost:
-
- - - - - - - - $376 2,100 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$376
2,100
lb
-
-
$
06: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$26,390
Cost:
$7,970
- - - - - - - - - - $26,390 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
$26,390
-
$
TOTAL RECOMMENDED Savings:
$31,257
Cost:
$13,871
$345 8,206 $214 24 $11 - $3,921 760 $376 2,100 $26,390 - $345
8,206
kWh
$214
24
kW-months/year
$11
-
$
$3,921
760
MMBtu
$376
2,100
lb
$26,390
-
$
TOTAL IMPLEMENTED Savings:
$26,960
Cost:
$8,295
$345 8,206 $214 24 $11 - - - - - $26,390 - $345
8,206
kWh
$214
24
kW-months/year
$11
-
$
-
-
MMBtu
-
-
lb
$26,390
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes