IAC logo
IAC Assessment: NV0148
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0148
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 2000
Principal Product Precision Sheet Metal Parts
NAICS n/a
SIC 3444 - Sheet Metalwork
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 53,000
Annual Production 6,000,000 Pieces
Production Hrs. Annual 4,160
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $52,713 3,593,494 kWh $0.01
Electricity Demand $28,880 3,112 kW-months/year $9.28
Electricity Fees $2,668 - $ -
Natural Gas $43,573 8,356 MMBtu $5.21
TOTAL ENERGY COSTS $127,834
RECOMMENDED SAVINGS* $19,375 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,034
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$768
Cost:
$1,500
- - - - - - $768 178 - - -
-
kWh
-
-
kW-months/year
-
-
$
$768
178
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,562
Cost:
$22,374
$10,533 205,158 $5,909 592 $120 - - - - - $10,533
205,158
kWh
$5,909
592
kW-months/year
$120
-
$
-
-
MMBtu
-
-
$
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,341
Cost:
$1,391
$117 (-2,931) - - $(-1) - $1,225 207 - - $117
(-2,931)
kWh
-
-
kW-months/year
$(-1)
-
$
$1,225
207
MMBtu
-
-
$
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$704
Cost:
-
- - - - - - - - $704 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$704
-
$
TOTAL RECOMMENDED Savings:
$19,375
Cost:
$25,265
$10,650 202,227 $5,909 592 $119 - $1,993 385 $704 - $10,650
202,227
kWh
$5,909
592
kW-months/year
$119
-
$
$1,993
385
MMBtu
$704
-
$
TOTAL IMPLEMENTED Savings:
$18,034
Cost:
$23,874
$10,533 205,158 $5,909 592 $120 - $768 178 $704 - $10,533
205,158
kWh
$5,909
592
kW-months/year
$120
-
$
$768
178
MMBtu
$704
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes