IAC Assessment: NV0168
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0168
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 2000
Principal Product bread, cake, and related products
NAICS n/a
SIC 2051 - Bread, Cake, And Related Products
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 20,000
Annual Production 12,000,000 Pieces
Production Hrs. Annual 7,488
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $150,419 2,409,000 kWh $0.06
Electricity Demand $34,352 4,166 kW-months/year $8.25
Electricity Fees $815 - $ -
Natural Gas $94,742 17,622 MMBtu $5.38
TOTAL ENERGY COSTS $296,845
RECOMMENDED SAVINGS* $135,768 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$23,982
Cost:
$160
$19,754 320,047 $4,228 513 - - $19,754
320,047
kWh
$4,228
513
kW-months/year
-
-
lb
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,550
Cost:
-
$1,277 20,809 $273 33 - - $1,277
20,809
kWh
$273
33
kW-months/year
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,700
Cost:
$8,947
$3,971 64,478 $729 22 - - $3,971
64,478
kWh
$729
22
kW-months/year
-
-
lb
04: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$99,450
Cost:
$400
- - - - $99,450 1,989,000 -
-
kWh
-
-
kW-months/year
$99,450
1,989,000
lb
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$6,086
Cost:
$2,074
- - - - $6,086 - -
-
kWh
-
-
kW-months/year
$6,086
-
lb
TOTAL RECOMMENDED Savings:
$135,768
Cost:
$11,581
$25,002 405,334 $5,230 568 $105,536 1,989,000 $25,002
405,334
kWh
$5,230
568
kW-months/year
$105,536
1,989,000
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)