IAC Assessment: OD0020
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0020
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1995
Principal Product Sandwiches and packaged meats
NAICS n/a
SIC 2099 - Food Preparations, Nec
Sales $50,000,000-$100,000,000
# of Employees 100
Plant Area (Sq.Ft.) 50,000
Annual Production 3,400,000 Pounds
Production Hrs. Annual 3,366
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $262,322 4,771,981 kWh $0.05
Natural Gas $31,973 4,786 MMBtu $6.68
Fuel Oil #2 $36,230 5,917 MMBtu $6.12
TOTAL ENERGY COSTS $330,525
RECOMMENDED SAVINGS* $29,225 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,459
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.1224 REPLACE BOILER Savings:
$14,400
Cost:
$20,000
- - - - - - $14,400 - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$14,400
-
$
02: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$7,452
Cost:
-
- - $(-25,155) (-5,325) $32,607 5,325 - - -
-
kWh
$(-25,155)
(-5,325)
MMBtu
$32,607
5,325
MMBtu
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,543
Cost:
$200
- - - - $4,543 741 - - -
-
kWh
-
-
MMBtu
$4,543
741
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$384
Cost:
$600
$384 6,448 - - - - - - $384
6,448
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.2522 ISOLATE HOT OR COLD EQUIPMENT Savings:
$1,080
Cost:
$527
$1,080 19,637 - - - - - - $1,080
19,637
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$916
Cost:
$927
$916 16,706 - - - - - - $916
16,706
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$450
Cost:
$603
$450 8,206 - - - - - - $450
8,206
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$29,225
Cost:
$22,857
$2,830 50,997 $(-25,155) (-5,325) $37,150 6,066 $14,400 - $2,830
50,997
kWh
$(-25,155)
(-5,325)
MMBtu
$37,150
6,066
MMBtu
$14,400
-
$
TOTAL IMPLEMENTED Savings:
$5,459
Cost:
$1,127
$916 16,706 - - $4,543 741 - - $916
16,706
kWh
-
-
MMBtu
$4,543
741
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes