IAC logo
IAC Assessment: OD0049
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0049
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1996
Principal Product Pre-stressed Concrete
NAICS n/a
SIC 3272 - Concrete Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 7,890
Annual Production 62,400 Tons
Production Hrs. Annual 2,000
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $109,208 2,418,230 kWh $0.05
Electricity Demand $54,427 8,184 kW-months/year $6.65
Electricity Fees $600 - $ -
LPG $164,354 29,212 MMBtu $5.63
Fuel Oil #2 $56,924 10,872 MMBtu $5.24
Fuel Oil #6 $41,859 14,606 MMBtu $2.87
Other Energy $7,282 1,599 MMBtu $4.55
TOTAL ENERGY COSTS $434,654
RECOMMENDED SAVINGS* $11,707 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,539
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$481
Cost:
$585
$481 10,551 - - $481
10,551
kWh
-
-
kW-months/year
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,071
Cost:
$4,256
$1,409 16,706 $662 100 $1,409
16,706
kWh
$662
100
kW-months/year
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$468
Cost:
$1,137
$248 5,569 $220 33 $248
5,569
kWh
$220
33
kW-months/year
04: 3.6194 SHIP HYDRAULIC OIL TO SECONDARY FUEL PROGRAM Savings:
$8,687
Cost:
$3,395
$7,127 157,679 $1,560 235 $7,127
157,679
kWh
$1,560
235
kW-months/year
TOTAL RECOMMENDED Savings:
$11,707
Cost:
$9,373
$9,265 190,505 $2,442 368 $9,265
190,505
kWh
$2,442
368
kW-months/year
TOTAL IMPLEMENTED Savings:
$2,539
Cost:
$5,393
$1,657 22,275 $882 133 $1,657
22,275
kWh
$882
133
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand