IAC logo
IAC Assessment: OD0062
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0062
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1996
Principal Product Laminated wall paneling
NAICS n/a
SIC 2435 - Hardwood Veneer And Plywood
Sales $100,000,000-$500,000,000
# of Employees 140
Plant Area (Sq.Ft.) 428,600
Annual Production 15,000,000 Thousand Feet
Production Hrs. Annual 2,250
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $334,073 4,542,204 kWh $0.07
Electricity Demand $7,439 2,094 kW-months/year $3.55
Electricity Fees $104,977 - $ -
Natural Gas $175,674 57,306 MMBtu $3.07
TOTAL ENERGY COSTS $698,433
RECOMMENDED SAVINGS* $42,253 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,755
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)
$ kWh $ MMBtu $ lb
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,072
Cost:
$2,400
$6,072 75,615 - - - - $6,072
75,615
kWh
-
-
MMBtu
-
-
lb
02: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$1,584
Cost:
$3,850
$1,584 31,653 - - - - $1,584
31,653
kWh
-
-
MMBtu
-
-
lb
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,718
Cost:
$2,400
$3,718 148,593 - - - - $3,718
148,593
kWh
-
-
MMBtu
-
-
lb
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,171
Cost:
$780
$994 31,653 $1,177 383 - - $994
31,653
kWh
$1,177
383
MMBtu
-
-
lb
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,512
Cost:
$8,748
$3,512 70,340 - - - - $3,512
70,340
kWh
-
-
MMBtu
-
-
lb
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$25,196
Cost:
-
- - - - $25,196 2,172,116 -
-
kWh
-
-
MMBtu
$25,196
2,172,116
lb
TOTAL RECOMMENDED Savings:
$42,253
Cost:
$18,178
$15,880 357,854 $1,177 383 $25,196 2,172,116 $15,880
357,854
kWh
$1,177
383
MMBtu
$25,196
2,172,116
lb
TOTAL IMPLEMENTED Savings:
$11,755
Cost:
$11,928
$10,578 177,608 $1,177 383 - - $10,578
177,608
kWh
$1,177
383
MMBtu
-
-
lb
Savings
Cost
$ kWh $ MMBtu $ lb
Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)