IAC Assessment: OD0070
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0070
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1996
Principal Product Fabricated Structural Steel
NAICS n/a
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 387,000
Annual Production 150 Pieces
Production Hrs. Annual 2,244
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $69,941 1,567,116 kWh $0.04
Electricity Demand $41,606 6,970 kW-months/year $5.97
Electricity Fees $25,099 - $ -
Natural Gas $21,920 3,785 MMBtu $5.79
TOTAL ENERGY COSTS $160,955
RECOMMENDED SAVINGS* $6,992 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,003
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas By-product Production Electricity Usage Electricity Demand Natural Gas By-product Production
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$648
Cost:
$312
$439 9,965 $209 35 - - - - $439
9,965
kWh
$209
35
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$850
Cost:
$800
$850 19,050 - - - - - - $850
19,050
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$425
Cost:
$100
$246 5,569 $179 30 - - - - $246
5,569
kWh
$179
30
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,667
Cost:
$1,436
$960 21,395 $707 118 - - - - $960
21,395
kWh
$707
118
kW-months/year
-
-
MMBtu
-
-
$
05: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$916
Cost:
$2,585
- - - - $916 233 - - -
-
kWh
-
-
kW-months/year
$916
233
MMBtu
-
-
$
06: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$2,486
Cost:
$800
- - - - - - $2,486 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,486
-
$
TOTAL RECOMMENDED Savings:
$6,992
Cost:
$6,033
$2,495 55,979 $1,095 183 $916 233 $2,486 - $2,495
55,979
kWh
$1,095
183
kW-months/year
$916
233
MMBtu
$2,486
-
$
TOTAL IMPLEMENTED Savings:
$5,003
Cost:
$3,036
$1,810 40,445 $707 118 - - $2,486 - $1,810
40,445
kWh
$707
118
kW-months/year
-
-
MMBtu
$2,486
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas By-product Production Electricity Usage Electricity Demand Natural Gas By-product Production