Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1996
Principal Product Industrial Fluid Pumps
NAICS n/a
SIC 3561 - Pumps And Pumping Equipment
Sales $50,000,000-$100,000,000
# of Employees 180
Plant Area (Sq.Ft.) 100,000
Annual Production 27,000 Pieces
Production Hrs. Annual 4,420
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $87,715 5,448,711 kWh $0.02
Electricity Demand $183,388 24,735 kW-months/year $7.41
Electricity Fees $61,639 - $ -
Natural Gas $7,209 974 MMBtu $7.40
TOTAL ENERGY COSTS $395,245
RECOMMENDED SAVINGS* $37,028 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,723
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ lb
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$7,046
Cost:
$60
$4,136 20,223 - - $2,910 393 - - - - - - $4,136
20,223
kWh
-
-
kW-months/year
$2,910
393
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
02: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$1,217
Cost:
$1,860
$1,217 69,754 - - - - - - - - - - $1,217
69,754
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,956
Cost:
$6,885
$2,898 179,367 $4,058 545 - - - - - - - - $2,898
179,367
kWh
$4,058
545
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,834
Cost:
$400
$1,834 114,009 - - - - - - - - - - $1,834
114,009
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
05: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$5,723
Cost:
$20,400
- - - - - - - - - - $5,723 34,600 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$5,723
34,600
lb
06: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$2,167
Cost:
$2,920
$174 10,844 $491 66 - - - - $1,502 600 - - $174
10,844
kWh
$491
66
kW-months/year
-
-
MMBtu
-
-
Tgal
$1,502
600
gal
-
-
lb
07: 3.3125 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS Savings:
$12,085
Cost:
$15,400
- - - - - - $12,085 8,085 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$12,085
8,085
Tgal
-
-
gal
-
-
lb
TOTAL RECOMMENDED Savings:
$37,028
Cost:
$47,925
$10,259 394,197 $4,549 611 $2,910 393 $12,085 8,085 $1,502 600 $5,723 34,600 $10,259
394,197
kWh
$4,549
611
kW-months/year
$2,910
393
MMBtu
$12,085
8,085
Tgal
$1,502
600
gal
$5,723
34,600
lb
TOTAL IMPLEMENTED Savings:
$5,723
Cost:
$20,400
- - - - - - - - - - $5,723 34,600 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$5,723
34,600
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ lb
Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Solid Waste (non-haz)