IAC logo
IAC Assessment: OD0093
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0093
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1997
Principal Product Special Machine Tools
NAICS n/a
SIC 3541 - Machine Tools, Metal Cutting Types
Sales $10,000,000-$50,000,000
# of Employees 190
Plant Area (Sq.Ft.) 187,000
Annual Production 15 Pieces
Production Hrs. Annual 4,420
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $143,623 6,648,007 kWh $0.02
Electricity Demand $213,174 27,062 kW-months/year $7.88
Electricity Fees $69,384 - $ -
Natural Gas $26,249 4,068 MMBtu $6.45
TOTAL ENERGY COSTS $453,895
RECOMMENDED SAVINGS* $8,654 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,990
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,668
Cost:
$11,164
$1,418 126,612 $3,250 412 - - - - $1,418
126,612
kWh
$3,250
412
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$322
Cost:
$560
$322 28,429 - - - - - - $322
28,429
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
03: 3.5112 REPROCESS SPENT OILS ON SITE FOR RE-USE Savings:
$1,164
Cost:
$3,797
- - - - $1,164 109 - - -
-
kWh
-
-
kW-months/year
$1,164
109
MMBtu
-
-
lb
04: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$2,500
Cost:
-
- - - - - - $2,500 300,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,500
300,000
lb
TOTAL RECOMMENDED Savings:
$8,654
Cost:
$15,521
$1,740 155,041 $3,250 412 $1,164 109 $2,500 300,000 $1,740
155,041
kWh
$3,250
412
kW-months/year
$1,164
109
MMBtu
$2,500
300,000
lb
TOTAL IMPLEMENTED Savings:
$4,990
Cost:
$11,724
$1,740 155,041 $3,250 412 - - - - $1,740
155,041
kWh
$3,250
412
kW-months/year
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb