Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Old Dominion Univ. |
---|---|
Assessment Year | 1997 |
Principal Product | Metalworking |
NAICS | n/a |
SIC | 3549 - Metalworking Machinery, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 53 |
Plant Area (Sq.Ft.) | 70,000 |
Annual Production | 55,000 Tons |
Production Hrs. Annual | 2,340 |
Location (State) | VA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $39,999 | 1,065,944 | kWh | $0.04 |
Electricity Demand | $37,201 | 4,631 | kW-months/year | $8.03 |
Electricity Fees | $134 | - | $ | - |
Fuel Oil #4 | $24,000 | 5,560 | MMBtu | $4.32 |
TOTAL ENERGY COSTS | $103,348 | |||
RECOMMENDED SAVINGS* | $4,852 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $488 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,576 Cost: $2,296 |
$852 | 22,860 | $724 | 90 | - | - | - | - |
$852 22,860 kWh |
$724 90 kW-months/year |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $992 Cost: $789 |
$992 | 26,377 | - | - | - | - | - | - |
$992 26,377 kWh |
- - kW-months/year |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $488 Cost: $40,000 |
$488 | 12,896 | - | - | - | - | - | - |
$488 12,896 kWh |
- - kW-months/year |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $421 Cost: - |
- | - | - | - | $421 | 500 | - | - |
- - kWh |
- - kW-months/year |
$421 500 gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $1,375 Cost: - |
- | - | - | - | - | - | $1,375 | 13,750 |
- - kWh |
- - kW-months/year |
- - gal |
$1,375 13,750 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $4,852 Cost: $43,085 |
$2,332 | 62,133 | $724 | 90 | $421 | 500 | $1,375 | 13,750 | $2,332 62,133 kWh |
$724 90 kW-months/year |
$421 500 gal |
$1,375 13,750 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $488 Cost: $40,000 |
$488 | 12,896 | - | - | - | - | - | - | $488 12,896 kWh |
- - kW-months/year |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) |