IAC logo
IAC Assessment: OD0099
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0099
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1997
Principal Product Corrugated Containers
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 149,200
Annual Production 720,000 Thousand Feet
Production Hrs. Annual 6,864
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $82,495 4,129,836 kWh $0.02
Electricity Demand $121,798 18,266 kW-months/year $6.67
Electricity Fees $40,320 - $ -
Natural Gas $28,953 19,454 MMBtu $1.49
LPG $28,953 3,322 MMBtu $8.72
TOTAL ENERGY COSTS $316,681
RECOMMENDED SAVINGS* $26,349 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,502
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Consumption Electricity Usage Electricity Demand Natural Gas Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,007
Cost:
$11,490
$3,163 158,265 $1,844 277 - - - - $3,163
158,265
kWh
$1,844
277
kW-months/year
-
-
MMBtu
-
-
Tgal
02: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING Savings:
$1,495
Cost:
$1,495
- - - - $1,495 448 - - -
-
kWh
-
-
kW-months/year
$1,495
448
MMBtu
-
-
Tgal
03: 2.2696 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS Savings:
$19,847
Cost:
$8,500
- - - - - - $19,847 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$19,847
-
Tgal
TOTAL RECOMMENDED Savings:
$26,349
Cost:
$21,485
$3,163 158,265 $1,844 277 $1,495 448 $19,847 - $3,163
158,265
kWh
$1,844
277
kW-months/year
$1,495
448
MMBtu
$19,847
-
Tgal
TOTAL IMPLEMENTED Savings:
$6,502
Cost:
$12,985
$3,163 158,265 $1,844 277 $1,495 448 - - $3,163
158,265
kWh
$1,844
277
kW-months/year
$1,495
448
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Consumption Electricity Usage Electricity Demand Natural Gas Water Consumption