Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Old Dominion Univ. |
---|---|
Assessment Year | 1998 |
Principal Product | Carbonated Beverages |
NAICS | n/a |
SIC | 2086 - Bottled And Canned Soft Drinks |
Sales | $100,000,000-$500,000,000 |
# of Employees | 104 |
Plant Area (Sq.Ft.) | 201,600 |
Annual Production | 276,000,000 Pieces |
Production Hrs. Annual | 6,528 |
Location (State) | VA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $177,715 | 8,475,381 | kWh | $0.02 |
Electricity Demand | $248,130 | 21,866 | kW-months/year | $11.35 |
Electricity Fees | $8,080 | - | $ | - |
Natural Gas | $121,798 | 39,168 | MMBtu | $3.11 |
TOTAL ENERGY COSTS | $699,799 | |||
RECOMMENDED SAVINGS* | $27,090 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $3,060 Cost: $9,300 |
$1,160 | 55,100 | $1,025 | 90 | - | - | - | - | $875 | - |
$1,160 55,100 kWh |
$1,025 90 kW-months/year |
- - gal |
- - lb |
$875 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $11,455 Cost: $23,895 |
$5,993 | 285,463 | $5,462 | 498 | - | - | - | - | - | - |
$5,993 285,463 kWh |
$5,462 498 kW-months/year |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,629 Cost: $509 |
$3,629 | 172,919 | - | - | - | - | - | - | - | - |
$3,629 172,919 kWh |
- - kW-months/year |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.8211 CONVERT TO AQUEOUS CLEANING SYSTEM |
Savings: $2,106 Cost: $1,300 |
- | - | - | - | $2,106 | 420 | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,106 420 gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS |
Savings: $6,840 Cost: - |
- | - | - | - | - | - | $6,840 | 36,000 | - | - |
- - kWh |
- - kW-months/year |
- - gal |
$6,840 36,000 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $27,090 Cost: $35,004 |
$10,782 | 513,482 | $6,487 | 588 | $2,106 | 420 | $6,840 | 36,000 | $875 | - | $10,782 513,482 kWh |
$6,487 588 kW-months/year |
$2,106 420 gal |
$6,840 36,000 lb |
$875 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Ancillary Material Cost |