IAC logo
IAC Assessment: OD0104
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0104
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1998
Principal Product Aluminum Seals
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 134
Plant Area (Sq.Ft.) 90,000
Annual Production 30,000 Pieces
Production Hrs. Annual 4,420
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $90,910 1,868,406 kWh $0.05
Electricity Demand $30,433 5,582 kW-months/year $5.45
Electricity Fees $5,172 - $ -
Natural Gas $121,798 13,760 MMBtu $8.85
TOTAL ENERGY COSTS $261,127
RECOMMENDED SAVINGS* $15,169 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Product Electricity Usage Electricity Demand Natural Gas Primary Product
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,047
Cost:
$8,241
$3,823 148,886 $2,224 409 - - - - $3,823
148,886
kWh
$2,224
409
kW-months/year
-
-
MMBtu
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$809
Cost:
$200
- - - - $809 113 - - -
-
kWh
-
-
kW-months/year
$809
113
MMBtu
-
-
$
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$453
Cost:
$98
- - - - $453 40 - - -
-
kWh
-
-
kW-months/year
$453
40
MMBtu
-
-
$
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$5,445
Cost:
$11,000
$5,445 111,958 - - - - - - $5,445
111,958
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$270
Cost:
$59
$210 4,396 $60 11 - - - - $210
4,396
kWh
$60
11
kW-months/year
-
-
MMBtu
-
-
$
06: 4.624 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME Savings:
$2,145
Cost:
$500
- - - - - - $2,145 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,145
-
$
TOTAL RECOMMENDED Savings:
$15,169
Cost:
$20,098
$9,478 265,240 $2,284 420 $1,262 153 $2,145 - $9,478
265,240
kWh
$2,284
420
kW-months/year
$1,262
153
MMBtu
$2,145
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Primary Product Electricity Usage Electricity Demand Natural Gas Primary Product