Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Old Dominion Univ. |
---|---|
Assessment Year | 1998 |
Principal Product | Candles and fragrant soap |
NAICS | n/a |
SIC | 3999 - Manufacturing Industries, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 75 |
Plant Area (Sq.Ft.) | 191,000 |
Annual Production | 5,000,000 Pieces |
Production Hrs. Annual | 3,000 |
Location (State) | VA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $50,170 | 954,572 | kWh | $0.05 |
Electricity Demand | $22,546 | 3,922 | kW-months/year | $5.75 |
Electricity Fees | $(-1,532) | - | $ | - |
Natural Gas | $22,546 | 7,061 | MMBtu | $3.19 |
Fuel Oil #2 | $27,753 | 4,441 | MMBtu | $6.25 |
TOTAL ENERGY COSTS | $122,480 | |||
RECOMMENDED SAVINGS* | $21,048 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,023 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #2 | Water Disposal | Solid Waste (non-haz) | Increase in Production | Electricity Usage | Electricity Demand | Fuel Oil #2 | Water Disposal | Solid Waste (non-haz) | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,091 Cost: $8,577 |
$2,117 | 40,152 | $974 | 170 | - | - | - | - | - | - | - | - |
$2,117 40,152 kWh |
$974 170 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $4,912 Cost: $990 |
- | - | - | - | $4,912 | 786 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,912 786 MMBtu |
- - Tgal |
- - lb |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $642 Cost: $800 |
$642 | 12,309 | - | - | - | - | - | - | - | - | - | - |
$642 12,309 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $253 Cost: $50 |
$184 | 3,517 | $69 | 12 | - | - | - | - | - | - | - | - |
$184 3,517 kWh |
$69 12 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $1,125 Cost: $8,000 |
- | - | - | - | - | - | - | - | $1,125 | 50,000 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$1,125 50,000 lb |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4151 MINIMIZE WATER USAGE |
Savings: $105 Cost: - |
- | - | - | - | - | - | $105 | 39,270 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$105 39,270 Tgal |
- - lb |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $10,920 Cost: $550 |
- | - | - | - | - | - | - | - | - | - | $10,920 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
$10,920 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $21,048 Cost: $18,967 |
$2,943 | 55,978 | $1,043 | 182 | $4,912 | 786 | $105 | 39,270 | $1,125 | 50,000 | $10,920 | - | $2,943 55,978 kWh |
$1,043 182 kW-months/year |
$4,912 786 MMBtu |
$105 39,270 Tgal |
$1,125 50,000 lb |
$10,920 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,023 Cost: $18,417 |
$2,943 | 55,978 | $1,043 | 182 | $4,912 | 786 | - | - | $1,125 | 50,000 | - | - | $2,943 55,978 kWh |
$1,043 182 kW-months/year |
$4,912 786 MMBtu |
- - Tgal |
$1,125 50,000 lb |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #2 | Water Disposal | Solid Waste (non-haz) | Increase in Production | Electricity Usage | Electricity Demand | Fuel Oil #2 | Water Disposal | Solid Waste (non-haz) | Increase in Production |