IAC logo
IAC Assessment: OD0114
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0114
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1998
Principal Product Aerospace Models
NAICS n/a
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $5,000,000-$10,000,000
# of Employees 70
Plant Area (Sq.Ft.) 41,000
Annual Production 20 Pieces
Production Hrs. Annual 6,760
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $35,857 701,641 kWh $0.05
Electricity Demand $13,090 2,328 kW-months/year $5.62
Electricity Fees $539 - $ -
Natural Gas $2,978 404 MMBtu $7.37
TOTAL ENERGY COSTS $52,464
RECOMMENDED SAVINGS* $25,768 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,679
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,198
Cost:
$1,457
$2,224 42,790 $974 173 - - - - $2,224
42,790
kWh
$974
173
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$143
Cost:
$80
$112 2,052 $31 6 - - - - $112
2,052
kWh
$31
6
kW-months/year
-
-
MMBtu
-
-
$
03: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT Savings:
$35
Cost:
$10
- - - - $35 5 - - -
-
kWh
-
-
kW-months/year
$35
5
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,303
Cost:
$509
$2,729 52,462 $574 102 - - - - $2,729
52,462
kWh
$574
102
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,123
Cost:
$50
$516 9,965 $607 14 - - - - $516
9,965
kWh
$607
14
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$538
Cost:
$1,010
- - - - $538 78 - - -
-
kWh
-
-
kW-months/year
$538
78
MMBtu
-
-
$
07: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$17,428
Cost:
$9,180
- - - - - - $17,428 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$17,428
-
$
TOTAL RECOMMENDED Savings:
$25,768
Cost:
$12,296
$5,581 107,269 $2,186 295 $573 83 $17,428 - $5,581
107,269
kWh
$2,186
295
kW-months/year
$573
83
MMBtu
$17,428
-
$
TOTAL IMPLEMENTED Savings:
$6,679
Cost:
$2,056
$5,065 97,304 $1,579 281 $35 5 - - $5,065
97,304
kWh
$1,579
281
kW-months/year
$35
5
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost