IAC Assessment: OD0121
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1998
Principal Product Paper Moisture Barriers
NAICS n/a
SIC 2672 - Paper Coated And Laminated, Nec
Sales $10,000,000-$50,000,000
# of Employees 105
Plant Area (Sq.Ft.) 300,000
Annual Production 0 Units
Production Hrs. Annual 8,760
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $61,337 3,848,769 kWh $0.02
Electricity Demand $106,193 7,007 kW-months/year $15.16
Electricity Fees $2,471 - $ -
Natural Gas $72,643 11,895 MMBtu $6.11
TOTAL ENERGY COSTS $242,644
RECOMMENDED SAVINGS* $29,608 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,320
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Consumption Primary Product Electricity Usage Electricity Demand Natural Gas Water Consumption Primary Product
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,192
Cost:
$6,908
$4,853 305,100 $6,339 418 - - - - - - $4,853
305,100
kWh
$6,339
418
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS Savings:
$3,843
Cost:
$9,910
$1,402 88,218 $2,441 161 - - - - - - $1,402
88,218
kWh
$2,441
161
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$241
Cost:
$420
$241 15,240 - - - - - - - - $241
15,240
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$365
Cost:
$220
$365 22,860 - - - - - - - - $365
22,860
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$672
Cost:
$110
- - - - $672 110 - - - - -
-
kWh
-
-
kW-months/year
$672
110
MMBtu
-
-
Tgal
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,833
Cost:
$1,495
- - - - $1,833 300 - - - - -
-
kWh
-
-
kW-months/year
$1,833
300
MMBtu
-
-
Tgal
-
-
$
07: 2.2111 INSTALL STEAM TRAP Savings:
$1,445
Cost:
$560
- - - - $1,226 88 $219 - - - -
-
kWh
-
-
kW-months/year
$1,226
88
MMBtu
$219
-
Tgal
-
-
$
08: 2.4156 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM Savings:
$10,017
Cost:
$2,800
- - - - - - - - $10,017 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$10,017
-
$
TOTAL RECOMMENDED Savings:
$29,608
Cost:
$22,423
$6,861 431,418 $8,780 579 $3,731 498 $219 - $10,017 - $6,861
431,418
kWh
$8,780
579
kW-months/year
$3,731
498
MMBtu
$219
-
Tgal
$10,017
-
$
TOTAL IMPLEMENTED Savings:
$24,320
Cost:
$11,953
$5,459 343,200 $6,339 418 $2,505 410 - - $10,017 - $5,459
343,200
kWh
$6,339
418
kW-months/year
$2,505
410
MMBtu
-
-
Tgal
$10,017
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Consumption Primary Product Electricity Usage Electricity Demand Natural Gas Water Consumption Primary Product