IAC logo
IAC Assessment: OD0124
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0124
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1998
Principal Product Processed Vegetables
NAICS n/a
SIC 2099 - Food Preparations, Nec
Sales $5,000,000-$10,000,000
# of Employees 120
Plant Area (Sq.Ft.) 55,000
Annual Production 0 Units
Production Hrs. Annual 2,063
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $52,189 1,235,639 kWh $0.04
Electricity Demand $16,312 2,898 kW-months/year $5.63
Electricity Fees $8,869 - $ -
Natural Gas $2,994 377 MMBtu $7.94
TOTAL ENERGY COSTS $113,777
RECOMMENDED SAVINGS* $14,402 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,935
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal
$ kWh $ kW-months/year $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,935
Cost:
$6,012
$1,711 40,445 $1,224 217 - - $1,711
40,445
kWh
$1,224
217
kW-months/year
-
-
Tgal
02: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS Savings:
$437
Cost:
$1,290
$79 4,982 $358 43 - - $79
4,982
kWh
$358
43
kW-months/year
-
-
Tgal
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,225
Cost:
$5,625
$3,225 76,495 - - - - $3,225
76,495
kWh
-
-
kW-months/year
-
-
Tgal
04: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$7,805
Cost:
$4,595
- - - - $7,805 2,338,920 -
-
kWh
-
-
kW-months/year
$7,805
2,338,920
Tgal
TOTAL RECOMMENDED Savings:
$14,402
Cost:
$17,522
$5,015 121,922 $1,582 260 $7,805 2,338,920 $5,015
121,922
kWh
$1,582
260
kW-months/year
$7,805
2,338,920
Tgal
TOTAL IMPLEMENTED Savings:
$2,935
Cost:
$6,012
$1,711 40,445 $1,224 217 - - $1,711
40,445
kWh
$1,224
217
kW-months/year
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal