IAC Assessment: OD0127
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0127
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1999
Principal Product Commercial Printing
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $1,000,000-$5,000,000
# of Employees 80
Plant Area (Sq.Ft.) 150,000
Annual Production 0 Units
Production Hrs. Annual 3,600
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $113,796 5,307,151 kWh $0.02
Electricity Demand $143,311 11,229 kW-months/year $12.76
Electricity Fees $10,710 - $ -
Natural Gas $7,011 784 MMBtu $8.94
TOTAL ENERGY COSTS $288,228
RECOMMENDED SAVINGS* $16,583 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,106
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,954
Cost:
$5,472
$1,428 66,823 $1,526 143 - - - - - - $1,428
66,823
kWh
$1,526
143
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT Savings:
$477
Cost:
$80
- - - - $477 60 - - - - -
-
kWh
-
-
kW-months/year
$477
60
MMBtu
-
-
Tgal
-
-
$
03: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$3,582
Cost:
$240
$821 38,394 - - - - $2,761 525,600 - - $821
38,394
kWh
-
-
kW-months/year
-
-
MMBtu
$2,761
525,600
Tgal
-
-
$
04: 2.8112 COMBINE UTILITY METERS Savings:
$9,570
Cost:
$5,000
- - - - - - - - $9,570 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$9,570
-
$
TOTAL RECOMMENDED Savings:
$16,583
Cost:
$10,792
$2,249 105,217 $1,526 143 $477 60 $2,761 525,600 $9,570 - $2,249
105,217
kWh
$1,526
143
kW-months/year
$477
60
MMBtu
$2,761
525,600
Tgal
$9,570
-
$
TOTAL IMPLEMENTED Savings:
$16,106
Cost:
$10,712
$2,249 105,217 $1,526 143 - - $2,761 525,600 $9,570 - $2,249
105,217
kWh
$1,526
143
kW-months/year
-
-
MMBtu
$2,761
525,600
Tgal
$9,570
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal One-time Revenue or Avoided Cost