Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1999
Principal Product Cat Litter
NAICS n/a
SIC 3298 -
Sales $5,000,000-$10,000,000
# of Employees 43
Plant Area (Sq.Ft.) 60,043
Annual Production 0 Units
Production Hrs. Annual 6,240
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $91,594 2,082,943 kWh $0.04
Electricity Demand $44,436 5,646 kW-months/year $7.87
Electricity Fees $(-1,667) - $ -
LPG $9,096 932 MMBtu $9.76
Wood $194,472 118,571 MMBtu $1.64
TOTAL ENERGY COSTS $337,931
RECOMMENDED SAVINGS* $104,453 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Wood Primary Raw Material Electricity Usage Electricity Demand Wood Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,888
Cost:
$13,066
$1,008 22,860 $880 112 - - - - $1,008
22,860
kWh
$880
112
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,153
Cost:
$800
$2,153 48,945 - - - - - - $2,153
48,945
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$8,350
Cost:
$30,000
- - - - $8,350 9,050 - - -
-
kWh
-
-
kW-months/year
$8,350
9,050
MMBtu
-
-
$
04: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$92,062
Cost:
$180,000
- - - - - - $92,062 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$92,062
-
$
TOTAL RECOMMENDED Savings:
$104,453
Cost:
$223,866
$3,161 71,805 $880 112 $8,350 9,050 $92,062 - $3,161
71,805
kWh
$880
112
kW-months/year
$8,350
9,050
MMBtu
$92,062
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Wood Primary Raw Material Electricity Usage Electricity Demand Wood Primary Raw Material