IAC logo
IAC Assessment: OD0148
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0148
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1999
Principal Product Gravure Printing
NAICS n/a
SIC 2754 - Commercial Printing, Gravure
Sales $10,000,000-$50,000,000
# of Employees 175
Plant Area (Sq.Ft.) 180,000
Annual Production 0 Units
Production Hrs. Annual 6,656
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $88,319 6,056,565 kWh $0.01
Electricity Demand $201,335 13,770 kW-months/year $14.62
Electricity Fees $3,406 - $ -
Natural Gas $190,668 36,348 MMBtu $5.25
TOTAL ENERGY COSTS $500,426
RECOMMENDED SAVINGS* $21,852 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,808
Cost:
$43,334
$3,389 232,122 $6,419 504 - - - - $3,389
232,122
kWh
$6,419
504
kW-months/year
-
-
MMBtu
-
-
Tgal
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,160
Cost:
$1,495
- - - - $1,160 221 - - -
-
kWh
-
-
kW-months/year
$1,160
221
MMBtu
-
-
Tgal
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$446
Cost:
$308
$173 12,016 $273 21 - - - - $173
12,016
kWh
$273
21
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.7314 REDUCE VENTILATION AIR Savings:
$1,954
Cost:
$504
$1,954 133,939 - - - - - - $1,954
133,939
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$4,090
Cost:
$450
- - - - $4,090 779 - - -
-
kWh
-
-
kW-months/year
$4,090
779
MMBtu
-
-
Tgal
06: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$368
Cost:
$90
$31 2,052 - - $337 72 - - $31
2,052
kWh
-
-
kW-months/year
$337
72
MMBtu
-
-
Tgal
07: 3.4155 METER WASTE WATER Savings:
$4,026
Cost:
$4,595
- - - - - - $4,026 1,576,994 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,026
1,576,994
Tgal
TOTAL RECOMMENDED Savings:
$21,852
Cost:
$50,776
$5,547 380,129 $6,692 525 $5,587 1,072 $4,026 1,576,994 $5,547
380,129
kWh
$6,692
525
kW-months/year
$5,587
1,072
MMBtu
$4,026
1,576,994
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal