IAC Assessment: OK0031
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0031
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1982
Principal Product MG & AL ANODES
NAICS n/a
SIC 3363 - Aluminum Die-castings
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 0
Annual Production 1,400,000 Pounds
Production Hrs. Annual 8,000
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $111,246 3,700,176 kWh $0.03
Natural Gas $252,550 111,658 MMBtu $2.26
TOTAL ENERGY COSTS $363,796
RECOMMENDED SAVINGS* $114,286 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,109
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2421 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER Savings:
$110,300
Cost:
$405,000
$110,300 3,199,883 - - $110,300
3,199,883
kWh
-
-
MMBtu
02: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$927
Cost:
$1,665
- - $927 378 -
-
kWh
$927
378
MMBtu
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,950
Cost:
$6,385
$1,950 - - - $1,950
-
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,109
Cost:
$280
$1,109 33,705 - - $1,109
33,705
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$114,286
Cost:
$413,330
$113,359 3,233,588 $927 378 $113,359
3,233,588
kWh
$927
378
MMBtu
TOTAL IMPLEMENTED Savings:
$1,109
Cost:
$280
$1,109 33,705 - - $1,109
33,705
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas