IAC logo
IAC Assessment: OK0034
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0034
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1982
Principal Product HEAT EXCHANGERS
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 0
Annual Production 300 Pieces
Production Hrs. Annual 3,680
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $154,176 4,410,024 kWh $0.03
Natural Gas $107,778 42,946 MMBtu $2.51
TOTAL ENERGY COSTS $261,954
RECOMMENDED SAVINGS* $55,699 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,616
Cost:
$135
$7,616 254,396 - - $7,616
254,396
kWh
-
-
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$501
Cost:
$121
$501 16,706 - - $501
16,706
kWh
-
-
MMBtu
03: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$44,316
Cost:
$156,240
- - $44,316 17,177 -
-
kWh
$44,316
17,177
MMBtu
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$275
Cost:
$80
$275 8,206 - - $275
8,206
kWh
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$656
Cost:
$560
$656 17,585 - - $656
17,585
kWh
-
-
MMBtu
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,335
Cost:
$6,560
$2,335 - - - $2,335
-
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$55,699
Cost:
$163,696
$11,383 296,893 $44,316 17,177 $11,383
296,893
kWh
$44,316
17,177
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas