IAC Assessment: OK0036
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0036
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1982
Principal Product CONCRETE BLOCKS ETC.
NAICS n/a
SIC 3271 - Concrete Block And Brick
Sales $5,000,000-$10,000,000
# of Employees 190
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 3,000
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $72,085 1,370,457 kWh $0.05
Natural Gas $128,888 50,502 MMBtu $2.55
TOTAL ENERGY COSTS $200,973
RECOMMENDED SAVINGS* $16,148 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,148
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,397
Cost:
$600
- - $4,397 1,692 -
-
kWh
$4,397
1,692
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,757
Cost:
$140
$3,757 75,909 - - $3,757
75,909
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,447
Cost:
$8,375
$6,447 105,510 - - $6,447
105,510
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,547
Cost:
$675
$1,547 31,360 - - $1,547
31,360
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$16,148
Cost:
$9,790
$11,751 212,779 $4,397 1,692 $11,751
212,779
kWh
$4,397
1,692
MMBtu
TOTAL IMPLEMENTED Savings:
$16,148
Cost:
$9,790
$11,751 212,779 $4,397 1,692 $11,751
212,779
kWh
$4,397
1,692
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas